一直以來(lái),方遠(yuǎn)將科技進(jìn)步和技術(shù)創(chuàng)新看作企業(yè)發(fā)展的命脈。2006年,公司設(shè)立了信息技術(shù)部、商務(wù)技術(shù)部、工藝技術(shù)部、工程技術(shù)部以及焊接技術(shù)部。
In 2006, the company established information technology department, business technology department, critical technology department, engineering technology department and welding technology department.
至今,技術(shù)中心已經(jīng)完成了許多的工程設(shè)計(jì),例如,迪士尼大型交通樞紐候車(chē)?yán)?、阿里巴巴一期、二期展示中心展示中心改造等。涵蓋了鋼結(jié)構(gòu)中的相關(guān)新技術(shù),新工藝分析、研發(fā)、鋼結(jié)構(gòu)工程方案設(shè)計(jì)、圖紙分解和質(zhì)量控制分析等技術(shù)解決了公司在運(yùn)營(yíng)時(shí)所遇到的眾多技術(shù)難題,**了公司承接的高難度項(xiàng)目能夠順利實(shí)施和完成。(如W酒店高難度異性景觀(guān)等)
Now,technology center has done a lot of engineering design, for example, the Disney stage 1 2 large transport hub waiting corridor alibaba exhibition center exhibition center renovation covers the steel structure of the related new technologies, such as research and development of new technology analysis and quality control of steel structure engineering design drawings decomposition analysis technology has solved the company of many technical problems encountered during operation, ensure the company to undertake the difficult project smooth implementation and completion (e.g., W difficult heterosexual landscape, etc.)
同時(shí),公司技術(shù)中心還與同濟(jì)大學(xué),邀請(qǐng)鋼結(jié)構(gòu)加固吳善能教授與公司設(shè)計(jì)人員共同承擔(dān)鋼結(jié)構(gòu)研究課題及鋼結(jié)構(gòu)設(shè)計(jì)的任務(wù)。
技術(shù)中心部分風(fēng)采